クレイン テクノ

TPS dictionary

Waste of accumulation

Waste of accumulation See stops delays or accumulation by focusing on the flow of the product production lead time=machi...
TPS dictionary

ABC production analysis

ABC production analysis ABC Analysis is a method of tiered inventory or supplier valuation that divides inventory/suppli...
Kaizen

Material Control

Material ControlFirst In, First Out① Way Posted rule of First In, First Out Case1: Case2: Using the inclined Korokon rol...
未分類

Dust Control

Dust Control Rules of Clean Room 1.Don't Bring Dust into Clean Room 2.Don't generate Dust  at Clean Room 3.Clear Dust Qu...
未分類

Static Electricity Control

Static Electricity Control Pasting conductive sheet In order to preventcharging of theplasticcover, and then paste the c...
Kaizen

Safety Control

Safety Control Hydrant layoutA hydrant layout put up a notice on board  Fixed alignment control of HydrantUse red Tape b...