クレイン テクノ

TPS dictionary

PM (Preventive Maintenance)

PM (Preventive Maintenance)Preventive Maintenance is the planned maintenance of plant infrastructure and equipment with ...
TPS dictionary

pitch | takt

The amount of time needed in a production area to make one container of products.The formula for pitch is:takt time x pa...
TPS dictionary

pacemaker

pacemakerWhat is a pacemaker ?It means a single point along a value stream that sets the pace for the entire stream.Only...
TPS dictionary

Overproduction

OverproductionProducing more,sooner or faster than is required by the next process or customer.Overproduction is when yo...
TPS dictionary

overburden | Muri

overburden | MuriMuri is one of three types of waste (muda, mura, muri) identified in the Toyota Production System. Wast...
TPS dictionary

Overall Equipment Effectiveness (OEE)

Overall Equipment Effectiveness (OEE)OEE is one of the essential TPM(Total Productive Maintenance)metrics.It measures ho...
TPS dictionary

Operating rate

Operating rateThe operating rate means the amount of time in a time frame (shift,day,etc.) that a machine is used to mak...
TPS dictionary

One Piece Flow

One Piece FlowOne Piece Flow is a fundamental element of becoming lean. To think of processing one unit at a time usuall...
TPS dictionary

Ohno Taiichi

Ohno TaiichiTaiichi Ohno ( February 29, 1912 – May 28, 1990) was a Japanese industrial engineer and businessman. He is c...
TPS dictionary

multi Skilled Operator

multi Skilled OperatorIn order to create continuous flow and improve true efficiency, an operator must  be  able to perf...